Project introduction: Centralized sewage treatment plants in cities, after treatment, they are discharged into urban pipelines. |
Location Malaysia Product Value US$216,980.00 Product Details Seamless pipe. API 5L GR.B, Flange Contract No. Nansteel202209164785 Date 09.2022 |
In the development of critical Sewage Treatment Projects in Malaysia, our premium seamless pipes, meticulously engineered to comply with the rigorous standards of API 5L GR.B, are integrated with high-quality flanges to form essential conduits and connections within the sewage treatment infrastructure. These seamlessly constructed pipelines, combined with precision-engineered flanges, play a pivotal role in facilitating the efficient and reliable conveyance of waste and wastewater, contributing to the effective operation of sewage treatment systems across Malaysia. |