Projects

Construction
Infrastructure project construction in Jordan
Infrastructure Project Construction in Jordan                                                                         
Project introduction:
According to project needs, provide durable industrial pipes and steel product solutions for this construction project, including underground pipes, drainage systems, etc.
   

                                                                                                                     

 
Location
Jordan
 
Product Value
US$1,536,386.00

 
Product Details
ASME B36.10 ERW Pipe, API 5L Gr.B
 
Contract No.
Nansteel202008327549

 
Date
08.2020

















Project Background:
Although the water supply systems throughout Jordan cover a wide area, the water supply is not always stable. Given the ongoing water scarcity, water losses from these systems are sometimes excessive, and this is a problem. The sewer system and wastewater treatment plants (WWTP) need to be upgraded and expanded in order to cope with growing population growth and to achieve beneficial reuse of wastewater in agriculture. 

In order to continue improving the water system infrastructure after project completion, the Water Authority of Jordan (WAJ) and Jordan Water Company (Miyahuna) must be prepared to improve the water sector in Jordan in the future.

Project Overview:
The Water and Wastewater Infrastructure Project is responding to much needed improvements in the water sector in order to improve the way water resources are used and wastewater treatment facilities are managed over the next 25 years. The project aims to achieve the following objectives:

1. Provide much needed water and wastewater infrastructure
2. Provide industrial pipelines and related steel product construction for WAJ and water utilities throughout Jordan

The WIP will implement an improved and more efficient water sector over the next five years; a comprehensive and fully responsive water resources strategy will be developed within the 2035 planning horizon.

Impacts:
1. Identification of needed infrastructure improvements through master planning and feasibility studies.
2. Selected infrastructure improvements for WAJ and Miyahuna, and completed designs for the East Jerash WTP, two Amman water projects, and the Tafilah WTP.
3. Design, survey and geotechnical investigation of selected water/wastewater infrastructure improvements for Amman area sewer, West Zarqa mainline and Wadi Arab Water System II in Irbid.

Know more about this product price, catalogue, mill test certificate,  please inquiry to: [email protected]