News

How to splice steel pipe pile

Steel pipe piles are a commonly used foundation construction material and are widely used in buildings, bridges, docks and other projects. The pile connection method of steel pipe piles refers to connecting the piles to the foundation in different ways during the installation process of the piles to improve the overall stability and seismic performance of the piles. This article will introduce several common methods of connecting steel pipe piles.

The first is the end-face connection method. This method is to connect the end faces of two steel pipe piles. Common connection methods include welding and threaded connection. Welding connection is to fuse the end faces of two steel pipe piles to form an integral connection. Threaded connection is to process threads on the end faces of steel pipe piles, and thread the two steel pipe piles together through threaded connectors. This connection method is simple and strong, and is suitable for smaller pile diameters and shallower pile foundations.

The second is the buried connection method. This method involves burying a section of a steel pipe pile into the foundation to form a buried connection. Common embedded connection methods include pre-embedded method and insertion method. The pre-embedded method is to reserve a hole of a certain depth in the foundation, bury a section of the steel pipe pile in the hole, and then fill it with concrete. The insertion method is to insert a section of a steel pipe pile directly into the foundation to form an insertion connection. This connection method is suitable for larger pile diameters and deeper pile foundations, and can improve the overall stability and load-bearing capacity of the piles.

Again is the casing connection method. This method is to coat the steel pipe pile with a layer of casing to form a casing connection. Sleeve connections can be fixed by welding or inserting. The casing connection can increase the overall stiffness and stability of the steel pipe pile, making it better able to withstand external forces and vibrations.

There are also two special pile connection methods: friction piles and clay piles. Friction piles transfer load through the friction between the pile body and the soil. Common friction piles include sinking piles and squeeze piles. Pile sinking is to sink steel pipe piles directly into the foundation, and the load is transmitted through the friction between the pile body and the soil. Squeeze piles are made by wrapping a layer of clay casing around a steel pipe pile and squeezing it into the foundation to form a squeeze pile connection. Clay piles insert steel pipe piles directly into the clay stratum, using the cohesiveness of the clay to increase the bearing capacity of the piles.

The methods of connecting steel pipe piles include end connection method, buried connection method, casing connection method, friction pile and clay pile, etc. Different pile connection methods are suitable for different engineering needs and geological conditions. In practical applications, it is necessary to select appropriate pile connection methods according to specific conditions, and carry out reasonable construction design and construction measures to ensure the safety, reliability and project quality of steel pipe piles.

Know more about this product price, catalogue, mill test certificate,  please inquiry to: [email protected]

Contact

We use cookies to offer a better browsing experience, analyze site traffic, and personalize content. By using this site, you agree to our use of cookies.

Accept
Decline