Project introduction:
This infrastructure project is essential to the short and long term growth and prosperity of the local community.It helps reduce costs for local families and businesses, and promotes healthier aquatic ecosystems and improved water quality.                                                                                                           
Water Supply Treatment Plant Project in Poland

                                                                                         
Location
Poland
 
Product Value
US$120,780.00

 
Product Details
ERW Pipe, API 5L X56 PSL1, 12 Inch, 12M
 
Contract No.
Nansteel202004232537

 
Date
04.2020




















The work plan of the project is mainly divided into three phases:

1. The first phase, construction of new sewers and collectors for the sewage treatment plant in Poland.

Due to the large scale of the project, the construction of heat collection system is further divided into three parts:
1) The first section consists of the installation of a 5.7 km jacking pipe on the right side of the Vistula;
2) In the second section, a 1.4 km OD 3000 (DN 2800) jacking pipe was installed along the left side of the river;
3) In the third section, the top pipes on both sides meet, and two parallel 63-inch diameter pipelines are inserted into a 4.5-meter diameter concrete tunnel built at the intersection below the river. The pipe used is the largest centrifugally cast fiberglass reinforced polymer mortar (CCFRPM) pipe.

2. The second phase, expanding and improving the city's drinking water supply, including upgrading the plant's treatment process, building a new water distribution network and implementing modern computer controls for water and wastewater systems.

3. The third phase, modernize and expand the central and left bank sewage treatment plants and the existing sewage pipe network of 6.7 kilometers.

Plant upgrades, construction of thermal sludge drying facilities, new transfer sewers, new distributed SIMATIC PSC 7 control system and modernization of the Bialolęka, Mlociny, Bielany and Rembertów wastewater systems are the biggest elements of the third phase.

Advantages of this project:

1. In addition to increased connectivity to the water distribution and wastewater collection network, the project has the potential to provide many other benefits. These include ensuring an effective supply of safe drinking water for the inhabitants of Polish cities, thereby minimising the threat of water to human health.

2. It can process 435,000 m3 wastewater every day. For several years, the Vistula River, which flows through the Warsaw metropolis, has been under pressure from the city's 2.1 million inhabitants, producing more than 200,000 cubic meters of wastewater every day. But with the upgrading of the wastewater treatment plant, which can treat 435,000 cubic meters of wastewater per day (up to 515,000 cubic meters during peak periods), the local water environment will be protected for many years to come.

Know more about this product price, catalogue, mill test certificate,  please inquiry to: sales@nan-steel.com

Contact

We use cookies to offer a better browsing experience, analyze site traffic, and personalize content. By using this site, you agree to our use of cookies.

Accept
Decline